
Author: Eric Barger
-
The 28-Day Myth
Throughout the construction industry, the common belief is that concrete takes 28 days to cure and reach 100% of its […]
-
Precast Math Tools: Calculate Manhole Blockout Volumes
How to precisely calculate large block-out volumes with a triple integral or handy chart A common calculation in precast concrete […]
-
Traffic-Related Tank Design
An Open Letter to Professional Engineers, Architects and Specifiers. Will a thicker top slab added to a normal-duty grease interceptor or septic tank be durable enough for heavy loads?