Go Behind the Scenes
Plant Tours
The Precast Show Plant Tours are a popular and fun event where guests travel to a nearby precast industry facility to get an up-close and inside look at how that facility operates.
Hard hat, safety vest, safety glasses and ear plugs are required on the tour and provided by NPCA. Closed-toe shoes also are required. You must be 18 years old to attend the plant tour.
Schedule
Wednesday, Feb. 3
Includes Continental Breakfast starting at 5:30 a.m.
KCM Basie Ballroom
Plant Tour 1 – NWPX Geneva – Salt Lake City
6:45 – 8:30 a.m.
Meet in Salt Lake Ballroom at 6:30 a.m.
Plant Tour 2 – NWPX Geneva – Orem
7 – 9:45 a.m.
Meet in Salt Lake Ballroom at 6:45 a.m.
Plant Tour 3 – NWPX Geneva – Salt Lake City
8 – 9:45 a.m.
Meet in Salt Lake Ballroom at 7:45 a.m.
Plant Tour 4 – NWPX Geneva – Orem
8:15 – 11 a.m.
Meet in Salt Lake Ballroom at 8 a.m.
Plant Tour 5 – NWPX Geneva – Salt Lake City
9:15 – 11 a.m.
Meet in Salt Lake Ballroom at 9 a.m.
2027 Tours
NWPX Geneva – Salt Lake City

NWPX Geneva – Salt Lake City is an NPCA Certified Precast plant that has been certified since 2007. NWPX Geneva – Salt Lake City provides pipe, catch basins, bridges, manholes, box culverts and custom precast vaults. Travel time to NWPX Geneva – Salt Lake City is about 15 minutes.
- Property Size: 19 acres
- Facility Size: 100,000 square feet
- Number of Employees: 70
- Years in Business: 70
- Products: Reinforced concrete pipe 12-inch to 60-inch, wetcast and drycast catch basins and 48-inch to 120-inch manholes, wet and dry utility boxes.
- Mixing and Production Equipment: Haarup mixer, Wiggert mixer, MBK cage machines including longitudinal feeder and cage robot, Kraft Curing System. Schlusselbauer Exact 2500 Pipe Machine, Schnell Bar Wiser 22SMF rebar shear/bender, Frogwire CNC Foam Cutter.
NWPX Geneva – Orem

NWPX Geneva – Orem is an NPCA Certified Precast plant that has been certified since 2003. NWPX Geneva – Orem provides catch basins, risers, manholes and other sanitary and stormwater products. Travel time to NWPX Geneva – Salt Lake City is about 45 minutes.
- Property Size: 20 acres
- Facility Size: 150,000 square feet
- Number of Employees: 100
- Years in Business: 70
- Products: Drycast box culvert, pipe, ERCP, manholes, wetcast sewer and storm manholes, 3-sided bridges, box culvert, catch basins, FRP and HDPE lined pipe and manholes.
- Mixing and Production Equipment: Tekmatic mixer, Schlusselbauer perfect manhole and pipe systems, DTI wire drawing machine, Kuka foam milling robot, drycast vibration tables