By Evan Gurley and Kayla Hanson, P.E.
What happens when 4,400-lb highway barriers are placed on top of a 10-ft-wide, 60-ft-long precast, prestressed concrete double tee? Engineers, precasters and students alike gathered in April 2014 at Colorado Precast Concrete in Loveland, Colorado, to find out.
What is a double tee?
Like the name implies, a precast, prestressed double tee resembles two side-by-side capital letter Ts. The two vertical leg sections are called webs or stems and the horizontal section is known as the deck or flange. Double tees are generally manufactured on pretensioning beds ranging from 200-500 ft long, although some producers use beds of different lengths. Beds are manufactured in the same orientation as double tees are to be installed in the field (the stems and lower surfaces of the flange are form finished and the top surface is finished manually).
Prestressing tendons are situated in the forms and are stressed prior to casting. These tendons consist of high tensile strength cables, typically of multiple strands. Each double tee’s flange is cantilevered from the stem. Conventional reinforcing steel is then placed in the flange to resist tensile stresses. The reinforcing steel also helps resist flexural stresses from out-of-plane loads and provides protection from drying shrinkage cracking.
After the concrete cast into the forms reaches a specified compressive strength, the tendon ends are cut, placing the stems in compression. This compression shortens the lower section of double tee, resulting in upward camber, which counteracts dead loads, live loads and creep deflection.
Once the double tees are welded together, the double tee joints are treated and, if applicable, toppings are applied. Waterproofing membranes can also be used to protect the double tee from water penetration.
Double tees offer plenty of flexibility in design and construction, where they are an ideal choice for structures requiring long, uninterrupted spans and high load carrying capabilities. The design of a prestressed double tee allows the deck to act integrally with the superstructure, as prestressed double tees have a monolithic deck and stem design. The integral design provides a stiffer member, while the material-saving shape reduces the dead load. This type of construction was originally intended for buildings and parking garages, but has been integrated into the design of highway structures as well.
Typical dimensions of prestressed double tees are:
- Stem depth: 12-34 in. (up to 5 ft)
- Flange width: 8-10 ft (up to 15 ft)
- Span length: 25-55 ft (up to 80 ft or more)
Under pressure
On April 17, 2014, the northern division of the Structural Engineers Association of Colorado hosted a double tee load test event at Colorado Precast Concrete in Loveland, Colorado. A full-size 10DT24+2 double tee (see “Decoding the double tee”) designed for a typical parking garage floor member was load tested to determine performance. Stresscon of Colorado Springs supplied the 10-ft-wide, 60-ft-long double tee for the demonstration.
The double tee was loaded to service level, 85%, ultimate, 110% and failure. Testing procedures closely followed those found in Chapter 20 of ACI 318, “Building Code Requirements for Structural Concrete,” except for the 24-hour applied load time and the response measurement, which were a result of time restrictions.
The objective of the testing was to determine the structural performance of a common double tee designed for a typical parking garage floor member while showing deflection and rebound. The double tee was loaded with 4,400-lb highway barriers for the five different loading phases, where the factored service load was determined to be 29,300 lbs. Barriers were loaded on the double tees with weights corresponding to the five different phases.
When loading the double tee at 85% of ultimate, 1 in. of deflection and 1 in. of rebound was recorded when barriers were removed. Test results showed the resiliency and the safety factor engineered into the design of the precast member. The double tee finally reached the failure phase when 20 barriers (88,000 lbs) were loaded, causing the double tee to deflect more than 44 in. and touch the ground. Although it was deemed failed, the double tee still held together despite nearly triple the calculated service load resting on the surface.
Tee time
Today, double tees are an ideal solution for projects involving bridges, parking decks, flooring and roofing systems, industrial buildings and more. No matter what the application, double tees are spanning longer distances and performing at higher levels than ever before.
Evan Gurley and Kayla Hanson, P.E. are technical services engineers with NPCA.
Sidebar – Double Tee Advantages
Precast, prestressed concrete double tees offer many advantages, making them suitable for construction of elevated parking decks as well as the substrate for waterproofing, roofing systems and buildings. The combination of robust reinforcing steel and the depth of the legs/stems allows the double tee to support loads over long spans. With their efficient cross section and high section modulus, precast double tees have been designed to span 80 ft or more.
Additional advantages include:
- Low initial project cost and little maintenance throughout the life of the product.
- Faster fabrication and erection, speeding up the construction process compared to cast-in-place structures.
- Higher durability and sound resistance, including the ability to withstand wind, road salt, earthquakes and even fire.
- A column-free solution.
- Simplified frame, design and construction.
- Openings for service pipes/ducts incorporated.
- Use of precast elements in frame is possible.
References
ACI 318 – Building Code Requirements for Structural Concrete
The following PDF diagrams accompany Table 1, above.
I would want to ask some things. Is there an existing NDT (Non-Destructive Test) for Precast Prestressed slab?
Thanks Rex for the inquiry. Non-Destructive tests do exist. An NPCA technical services engineer is going to contact you via email to get some more clarification about what specific test you need.
Would like to know how much of a camber there is on a 50 foot long and 24 inch in depth double tee?
3″
2.5 inches thru 3
In a building remodel situation where one of the bearing wall needs to be replaced, is there an accepted shoring method that allows for the end bearing condition to be temporarily moved away from the end of the double Tee to allow for wall demolition and rebuild?
Thank you for the comment Fred. I forward your question to our Technical Services engineers. The following response is from Eric Carleton, P.E., director of codes and standards. He also emailed you directly his response as well.
Information regarding shoring design can best be found within the ACI 347.2R-05, “Guide for Shoring/Reshoring of Concrete Multistory Buildings.”
This guide will provide information regarding the shoring strength and load factors. The key to shoring the double tee ceiling component described would be to analyze how far from the beam end the shoring bearing plate will be and if that placement is far enough from the original end bearing to remove the existing wall to not adversely alter the original designed tensile, compressive and shear zones of the beam.
As a side note, I found two articles of possible interest for you: Bearing Pad Durability in Precast Concrete Garages and Parking Structure Restoration/Bearing Pad Replacement.
These articles describe raising double tee beams to replace the worn bearing pads within parking garage structures. Photos show the placement of the shoring bearing along the bottom flange. In addition, it also cautions about protecting the shoring from rotation. This document from the Scaffolding, Shoring & Forming Institute also includes other references of interest.
How much deflection allow in double.tee after screed or any liveload ,roofload design base
Thank you for the comment m.asif khan. Sounds like an interesting project you are working on. I’d be happy to forward your questions to our Technical Services engineers. Would you be able to explain a bit more about your project? Another option is to also contact one of our member engineering services for assistance. You can find a list by clicking here. They would be more than happy to answer your questions as well. Thank you.
How can we will stressing with hydraulic jack without gauge and with using strand length
Thank you for the comment Asif. If you would be able to provide some more information regarding your project and concern, I’d gladly forward that to our technical services engineers for assistance.
How much chamber will be in 50’long double tee
Thank you for your comment asif. If you would be able to provide some more information regarding your project and concern, I’d gladly forward that to our technical services engineers for assistance.
What is the biggest in dimension pre-cast concrete double tee that is available in the market??
Can HVAC openings be cut through the top flange? Is the full top flange used in the design, or just a portion of it?
Hey,good article and information given by you for Strength to a Double Tee.